First half of the lower cockpit coaming.

My plan for the kayak when I got home from work this evening was to glue up the complete lower cockpit coaming, that is, both halves at once, but it didn’t work out that way. I have 24 spring clamps and when I dry fit the lower coaming pieces it looked like 12 clamps on each side would be plenty. But when I got thickened epoxy on one half of the lower coaming and started to clamp it up I could see that I wasn’t getting good squeeze out in places. I kept adding clamps, and finally resorted to Vice-Grips in a couple of places as well, and wound up using 18 of my clamps. I then had a devil of a time cleaning up the squeeze out so that it wasn’t all over the place because the clamps were in my way! I’ll use a bit less epoxy on the second side. I also wound up wasting about an ounce of thickened epoxy because I only glued up half as much as I thought I was going to. Now I have to wait until tomorrow to do the second half. Hurry up and wait! EDIT: After getting some advice from Suzanne at Pygmy, I opted to wait an additional day to remove the clamps and start on the second side. Because there is so much spring tension in the places where the coaming has been forced to conform to the curve of the cockpit apron, I want to be absolutely sure that the epoxy is fully cured. These photos were made on a Friday evening. I will not release the clamps (or the Kraken) until Sunday morning.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.